No caption
IMG_1971.JPG
Details
39.32608, -120.20224
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
AI Analysis
Two construction workers are engaged in surface restoration at the site. One worker operates a compaction plate on a freshly backfilled trench, while the other uses a broom to clear debris. The site is in the late phase of trench backfilling, transitioning into surface finishing. The trench shows signs of compaction with the use of industrial machinery.
Equipment & Materials
AI Tags
Analyzed Mar 11, 2026
Nearby Photos
3m
pipeline installation
4m
electrical
6m
pipeline installation
10m
excavation
10m
pipeline installation
11m
surface restoration
11m
pipeline installation
14m
excavation
14m
pipeline installation
14m
excavation