No caption
IMG_1589.JPG
Details
Friday, November 14, 2025 · 11:27 AM
39.39458, -120.02095· 1651m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/121sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue4.8030
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:11:14
GPSDestBearing273.1518
GPSDestBearingRefTrue North
GPSHPositioningError137.5333
GPSImgDirection273.1518
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp19:27:22
HostComputeriPhone 16 Pro
latitude39.3946
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0209
MeteringModePattern
ModifyDate2025-11-14T11:27:24.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.9235
Software26.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized206
SubSecTimeOriginal206
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Inside the water treatment plant, trenching work is underway with gravel fill along the trench's base and green pipes laid out for installation. A shovel leans against the trench side and an excavator is visible in the background. The area is framed by wooden walls, suggesting indoor work. Open space with soil, indicating active construction work.
trenching
exposed soil and gravel in trench indoor artificial lighting open access for equipment and personnel
Safety controls are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
4m
excavation
excavationequipment-inspection
excavator-bucket
4m
trenching
trenchingexcavation
shovel
6m
pipeline installation
trenchingpipe-laying
excavator
6m
valve vault
excavationvalve-maintenance
valve
7m
excavation
boulder-movingtrenching
excavator
7m
trenching
pothole-utility-locatingmeasurement
tape-measure
7m
site grading
stake-markingsite-survey
metal-stake
7m
excavation
excavationconcrete-removal
excavator
7m
trenching
trenchingpipe-installation
shovel
8m
trenching
trenchingutility-locating
skid-steer