No caption
IMG_9733.JPG
Details
Tuesday, August 26, 2025 · 1:54 PM
39.39464, -120.02098· 1652m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/535sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.4810
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:08:26
GPSDestBearing43.7594
GPSDestBearingRefTrue North
GPSHPositioningError17.1518
GPSImgDirection43.7594
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:54:50
HostComputeriPhone 16 Pro
latitude39.3946
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0210
MeteringModePattern
ModifyDate2025-08-26T13:54:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.0643
Software18.6.1
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized707
SubSecTimeOriginal707
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavated area with heavy equipment operating to break or remove concrete. Two excavators are visible, one actively engaging with the concrete. PVC pipes are seen exposed beneath a broken slab. A worker in a hi-vis vest is present near the excavation area.
excavation
exposed earth and broken concrete outdoor, daylight moderate with machinery and materials
Some PPE is visible, but specific safety controls are not evident in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
pothole-utility-locatingmeasurement
tape-measure
1m
trenching
trenchingutility-locating
skid-steer
1m
trenching
pipeline-installationtrenching
pvc-pipe
1m
trenching
trenchingpipe-exposure
excavator
2m
excavation
utility-locatingpotholing
tape-measure
2m
pipeline installation
trenchingpipe-laying
excavator
2m
valve vault
vault-installationutility-excavation
gravel
3m
site grading
site-gradingutility-preparation
compact-excavator
3m
survey layout
utility-markingsurveying
3m
trenching
trenchingutility-exposure
shovel