No caption
IMG_0570.JPG
Details
Tuesday, September 30, 2025 · 1:22 PM
39.39244, -120.02271· 1565m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/574sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.7527
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:30
GPSDestBearing103.0216
GPSDestBearingRefTrue North
GPSHPositioningError61.6694
GPSImgDirection103.0216
GPSImgDirectionRefT
GPSSpeed1.9938
GPSSpeedRefK
GPSTimeStamp20:22:52
HostComputeriPhone 16 Pro
latitude39.3924
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-09-30T13:22:53.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.1659
Software26.0
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized609
SubSecTimeOriginal609
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers are inside a trench working on the installation of pipelines, which are laid on the ground. A loader is positioned nearby on the dirt path above the trench. The workers are using hand tools to work on the pipelines, and the trench appears to be supported by soil walls without visible trench boxes.
pipeline-installation
bare soil and open trench overcast access via dirt path, open trench visible
Workers are observed wearing appropriate PPE, but no additional safety controls are visible in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
9m
site grading
site-gradingroadwork
excavator
9m
swppp erosion control
erosion-control-installationerosion-control-logs
excavator
10m
swppp erosion control
slope-stabilizationerosion-control
erosion-control-blankets
10m
pipeline installation
pipe-layingcapping
pipes
10m
trenching
trenchingpipe-laying
backhoe
11m
trenching
trenchingduct-bank-installation
excavator
11m
site grading
site-gradingdirt-pile
trucks
11m
swppp erosion control
erosion-controlsite-preparation
backhoe-loader
12m
backfill
soil-compactioncompactor
compactor
12m
trenching
trenchingsoil-compaction
compaction-machine