No caption
IMG_0140.JPG
Details
Friday, September 12, 2025 · 10:43 AM
39.39419, -120.02147· 1658m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/123sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.1264
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:09:12
GPSDestBearing195.0980
GPSDestBearingRefTrue North
GPSHPositioningError123.4468
GPSImgDirection195.0980
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:43:17
HostComputeriPhone 16 Pro
latitude39.3942
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0215
MeteringModePattern
ModifyDate2025-09-12T10:43:18.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.9395
Software26.0
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized159
SubSecTimeOriginal159
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A backhoe is actively excavating a trench adjacent to a wooden utility pole. The trench reveals layers of soil and rocks with some embedded roots. The area appears to be prepared for underground work, given the exposed utilities and disturbed earth.
excavation
rocky and soil layers with vegetation daylight conditions restricted access due to excavation
Safety features are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
6m
pipeline installation
pipeline-installationtrenching
shovel
13m
site grading
ground-preparationsurface-leveling
wheel-loader
18m
trenching
trenchingexcavation
excavator
24m
paving surface restoration
road-maintenancesurface-restoration
road-construction-equipment
25m
paving surface restoration
surface-preparationgrading
gravel
28m
pipeline installation
pipe-sealingpipe-penetration
sealant
29m
survey layout
survey-layoututility-marking
work-van
30m
excavation
excavation-activitypipe-exposure
broken-concrete
30m
trenching
trenchingtrench
backhoe
32m
excavation
excavatingtrenching
bulldozer