No caption
IMG_9952.JPG
Details
Friday, September 5, 2025 · 2:03 PM
39.39467, -120.02241· 1633m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/901sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.7232
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:05
GPSDestBearing93.9864
GPSDestBearingRefTrue North
GPSHPositioningError12.4003
GPSImgDirection93.9864
GPSImgDirectionRefT
GPSSpeed0.3296
GPSSpeedRefK
GPSTimeStamp21:3:47
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0224
MeteringModePattern
ModifyDate2025-09-05T14:03:49.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.8152
Software18.6.2
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized234
SubSecTimeOriginal234
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with newly installed blue pipes and a construction worker performing installation activities. Heavy machinery, including a backhoe loader and a dump truck, are positioned near the trench. The ground surface is a combination of dirt and pavement, with an open trench clearly visible. Construction cones are placed near the trench indicating safety measures.
pipeline-installation
dirt and pavement with open trench sunny conditions with clear lighting equipment access appears congested but manageable
Safety cones and PPE are in use, with an open trench posing a hazard.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
trenching
pipe-exposurelevel-checking
level-tool
0m
survey layout
survey-setupwaterline-survey
gnss-receiver
2m
trenching
pipe-layingtrenching
excavator
3m
trenching
trenchingpipe-installation
excavator
3m
trenching
pipe-installationtrenching
construction vehicle
3m
excavation
pothole-utility-locatingexposed-pipe
pipe
3m
other
utility-markingpothole-preparation
utility-locator
4m
trenching
trenchinginspection
compact track loader
4m
excavation
excavationtrench
excavator
4m
trenching
trenchingexcavation
excavator