No caption
IMG_0843.JPG
Details
Friday, October 10, 2025 · 11:26 AM
39.39276, -120.02262· 1631m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1167sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.7235
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:10
GPSDestBearing127.6016
GPSDestBearingRefTrue North
GPSHPositioningError6.3394
GPSImgDirection127.6016
GPSImgDirectionRefT
GPSSpeed1.4580
GPSSpeedRefK
GPSTimeStamp18:26:53
HostComputeriPhone 16 Pro
latitude39.3928
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-10-10T11:26:54.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.1884
Software26.0.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized174
SubSecTimeOriginal174
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench at an excavation site with a blue pipeline being installed. Several traffic cones are placed around the trench for safety. There is a construction vehicle positioned nearby, and a camper-like structure is visible in the background. The trench is surrounded by gravel and dirt, suggesting active excavation work.
pipeline-installation
gravel and dirt with an open trench daylight, sunny adequate space around trench for equipment and materials
Safety features such as traffic cones are visible around the open trench.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
trenching
pipe-installationtrenching
loader
1m
trenching
trenchingconduit-installation
excavator
1m
trenching
trenchingpipeline-installation-preparation
trailer
1m
site grading
site-gradingearth-moving
roller compactor
1m
trenching
trenchingduct-bank-installation
duct-banks
1m
pipeline installation
trenchingpipe-installation
excavator
1m
pipeline installation
pipeline-installationtrenching
truck
2m
excavation
excavationrock-moving
excavator
2m
trenching
trenchingconduit-installation
conduit
2m
trenching
trenchingpipeline-staging
SUV