No caption
IMG_8867.JPG
Details
Thursday, July 17, 2025 · 2:05 PM
39.39318, -120.02276· 1627m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1613sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.5450
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:17
GPSDestBearing167.7689
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection167.7689
GPSImgDirectionRefT
GPSSpeed0.3607
GPSSpeedRefK
GPSTimeStamp21:5:21
HostComputeriPhone 16 Pro
latitude39.3932
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0228
MeteringModePattern
ModifyDate2025-07-17T14:05:22.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.6554
Software18.6
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized940
SubSecTimeOriginal940
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench along a dirt road with a worker operating equipment within it. There are two excavators, one on each side of the trench area. The trench is relatively deep and likely prepared for utility installation, though specific pipes or cables are not visible. The terrain is mountainous with sparse vegetation.
trenching
dirt road and trench with rocky soil sunny day open access along the road
Some PPE is visible, but specific safety controls are not visible in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
5m
trenching
trenchingpipeline-installation
bulldozer
6m
site grading
gradingroad-maintenance
grading-equipment
6m
pipeline installation
pipe-joiningpipeline-laying
pipe
6m
site grading
hole-preparationsite-grading
soil
7m
survey layout
surveyinglayout
surveying equipment
7m
pipeline installation
pipe-layingtrenching
excavator
8m
trenching
trenchingexcavation-work
excavators
8m
pipeline installation
pipe-installationpipeline-connection
pipes
8m
trenching
trenchingpipe-installation
compactor
8m
trenching
trenchingexcavation
backhoe-loader