No caption
IMG_8883.JPG
Details
Friday, July 18, 2025 · 12:03 PM
39.39314, -120.02268· 1626m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/1451sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.9709
BrightnessValue9.5402
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat120
GPSDateStamp2025:07:18
GPSDestBearing142.4667
GPSDestBearingRefTrue North
GPSHPositioningError15.7897
GPSImgDirection142.4667
GPSImgDirectionRefT
GPSSpeed0.0936
GPSSpeedRefK
GPSTimeStamp19:3:56
HostComputeriPhone 16 Pro
latitude39.3931
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-07-18T12:03:56.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5032
Software18.6
SubjectArea{"0":1999,"1":1521,"2":2204,"3":1333}
SubSecTimeDigitized960
SubSecTimeOriginal960
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows two parallel blue pipes running horizontally, partially embedded in earth. Each pipe is being secured with metal clamps at joint sections, and at least one elbow fitting is visible. The pipes appear to be part of a larger piping system being installed or maintained.
pipeline-installation
exposed soil with trenches sunlit conditions no staging areas visibly congested
Safety features are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingsoil-excavation
2m
pipeline installation
conduit-installationtrenching
excavator
3m
trenching
trenchingcompaction
excavator
3m
site grading
hole-preparationsite-grading
soil
4m
trenching
trenchingpipeline-installation
bulldozer
4m
site grading
surface-gradingpath-preparation
gravel
4m
trenching
trenchingutility-installation
loader
5m
pipeline installation
pipeline-connectionvalve-installation
hand tools
5m
pipeline installation
pipeline-installationcomponent-connection
hand tools
5m
trenching
pipe-trenchingpipe-installation
soil