No caption
IMG_7473.JPG
Details
Wednesday, April 30, 2025 · 2:48 PM
39.39194, -120.02164· 1657m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1211sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.9471
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:30
GPSDestBearing164.4673
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection164.4673
GPSImgDirectionRefT
GPSSpeed0.0085
GPSSpeedRefK
GPSTimeStamp21:48:30
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-04-30T14:48:30.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.2416
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized893
SubSecTimeOriginal893
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image captures a trenching operation with an excavator positioned at the top of a dirt slope. A worker wearing visible PPE is situated midway on the slope. The trench appears to be newly dug, with clear soil edges and loose earth along the sides. Trees border the trenching area, indicating a forested or natural setting.
trenching
exposed soil with loose earth and rocks partly cloudy with natural daylight slope with trench access limited by terrain
Worker is wearing PPE, but no other specific safety controls are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
0m
excavation
excavationtrenching
excavator
1m
trenching
slope-excavationmachinery-operation
excavator
1m
trenching
trenchingearthwork
hand rake
2m
swppp erosion control
erosion-controlswppp-compliance
erosion control blanket
3m
trenching
trenchingexcavation-activity
excavator
3m
swppp erosion control
erosion-controlwattle-placement
wattles
3m
trenching
trenchingexcavation-work
excavator
3m
pipeline installation
conduit-installationtrenching
excavator
3m
trenching
trenchingsite-preparation
hand-rake
3m
site grading
vehicle-parkingsite-grading
trucks