No caption
IMG_7354.JPG
Details
Friday, April 25, 2025 · 8:48 AM
39.39202, -120.02228· 1645m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/551sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.7357
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:25
GPSDestBearing140.8832
GPSDestBearingRefTrue North
GPSHPositioningError713.9025
GPSImgDirection140.8832
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp15:48:3
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0223
MeteringModePattern
ModifyDate2025-04-25T08:48:07.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.1050
Software18.5
SubjectArea{"0":2849,"1":2137,"2":3291,"3":1884}
SubSecTimeDigitized451
SubSecTimeOriginal451
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench running through a dirt area with two blue pipes laid parallel in the trench. The pipes extend along the trench under a wooded area, with a worker visible in the background attending to the pipes. The surrounding area shows bare earth and minimal vegetation, indicating ongoing installation work.
pipeline-installation
trench in dirt with exposed soil overcast daylight clear trench access
PPE is visible on the worker, but no additional safety controls are visible in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
4m
excavation
earth-movingsoil-excavation
tracked-excavator
5m
swppp erosion control
erosion-controlswppp-implementation
utility-vehicle
6m
trenching
trenchingtrench
fencing
6m
trenching
trench-workutility-location
soil
6m
trenching
trench-installationpipe-laying
shovel
6m
trenching
trenchingexcavation
soil
6m
trenching
trenchingtrench
excavator
7m
trenching
trenchingcheck-dams-installation
check dams
7m
trenching
trenchingutility-preparation
bulldozer or similar
7m
trenching
layout-measurementtrenching-activity
bulldozer