No caption
IMG_2660.JPG
Details
Tuesday, January 27, 2026 · 8:03 AM
39.39452, -120.02264· 1638m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/216sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.8090
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:27
GPSDestBearing218.4009
GPSDestBearingRefTrue North
GPSHPositioningError78.4414
GPSImgDirection218.4009
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp16:3:0
HostComputeriPhone 16 Pro
latitude39.3945
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2026-01-27T08:03:04.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.7548
Software26.2
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized753
SubSecTimeOriginal753
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker using a jackhammer to break pavement, indicating trenching work on a road. An excavator is parked to the left with its boom lowered. Safety cones and an open trenching line mark the work area. The operator is wearing appropriate PPE including a hard hat, hi-vis jacket, and gloves.
trenching
pavement with open trench overcast daylight equipment staged beside work zone
Worker is wearing PPE and a safety cone is present; the trench is open with no additional visible controls.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipeline-installation
excavator
2m
trenching
trenchingutility-work
blue-pipe
2m
trenching
compactiontrenching
compactor
3m
trenching
trenchingpipe-installation
soil
3m
paving surface restoration
pavement-restorationroadwork
compact-roller
3m
trenching
trenchingsafety-cones
excavator
3m
excavation
pothole-utility-locatingdepth-measurement
4m
paving surface restoration
surface-millingroad-preparation
soil compactor
5m
trenching
trenchingexcavation
excavator
5m
excavation
potholingutility-locating
measuring tape