No caption
IMG_2657.JPG
Details
Monday, January 26, 2026 · 3:58 PM
39.39454, -120.02258· 1635m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/311sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.0698
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2026:01:26
GPSDestBearing359.2267
GPSDestBearingRefTrue North
GPSHPositioningError8.0417
GPSImgDirection359.2267
GPSImgDirectionRefT
GPSSpeed1.4250
GPSSpeedRefK
GPSTimeStamp23:58:18
HostComputeriPhone 16 Pro
latitude39.3945
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2026-01-26T15:58:19.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.2814
Software26.2
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized989
SubSecTimeOriginal989
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A trench is being excavated alongside a road with orange construction cones marking the area. PVC pipes can be seen staged for installation within the trench. There is a mini-excavator on site as well as personnel wearing appropriate PPE. The work appears to involve pipe installation or replacement.
pipeline-installation
pavement alongside dusty trench clear daylight conditions easy roadside access with visible cones marking closure
Safety cones mark the work area, and personnel are wearing PPE.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipeline-installation
yellow vehicle
2m
trenching
trenchingexcavation
backhoe loader
3m
trenching
trenchingroadway-excavation
excavator
3m
trenching
trenchingexcavation
excavator
4m
excavation
pothole-utility-locatingpothole
dirt
4m
trenching
compactiontrenching
compactor
5m
trenching
trenchingpipe-installation
excavator
5m
trenching
trenchingutility-work
blue-pipe
5m
paving surface restoration
surface-millingroad-preparation
soil compactor
5m
site grading
road-closuredetour-setup
excavator