No caption
IMG_2644.JPG
Details
Monday, January 26, 2026 · 1:50 PM
39.39459, -120.02262· 1639m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/5714sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.3636
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:26
GPSDestBearing10.8167
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection10.8167
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:50:50
HostComputeriPhone 16 Pro
latitude39.3946
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2026-01-26T13:50:50.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.4804
Software26.2
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized948
SubSecTimeOriginal948
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts an open trench along a paved sidewalk. Several orange safety cones are placed near the edge for visibility. Two long blue pipes are positioned on the ground beside the trench. A nearby fire hydrant is visible on the right, indicating proximity to utility systems.
trenching
paved surface with trench along edge sunny conditions casting shadows open access to trench along sidewalk
Safety cones are visible around the trench, marking potential hazards.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipe-installation
excavator
2m
trenching
trenchingpipe-installation
excavator
2m
survey layout
surveyingtraffic-cone
survey tripod
2m
trenching
trenchingroad-work
large-truck
2m
trenching
trenchingexcavation
excavator
2m
site grading
site-accessparking
rv
3m
trenching
trenchingexcavation
excavator
3m
excavation
excavationearth-moving
excavator
3m
trenching
trenchingpipe-installation
excavator
4m
trenching
trenchingexcavation-work
excavator