No caption
IMG_7087.JPG
Details
Wednesday, April 9, 2025 · 3:22 PM
39.39143, -120.02123· 1682m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2611sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.9458
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:09
GPSDestBearing104.2674
GPSDestBearingRefTrue North
GPSHPositioningError2.9664
GPSImgDirection104.2674
GPSImgDirectionRefT
GPSSpeed0.4383
GPSSpeedRefK
GPSTimeStamp22:22:9
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-04-09T15:22:10.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.3504
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized321
SubSecTimeOriginal321
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a circular formwork structure with a grid of rebar set up for a concrete pour, likely for a tank foundation. Wooden supports and braces are arranged in a radial pattern around the rebar. Trees and natural terrain are seen in the background, indicating an outdoor location. Dirt and mixed rocky surface surround the work area.
rebar-formwork
dirt and rocky sunny daylight adequate open space around the work area
Safety features are not visibly indicated in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
valve vault
pipeline-connectionvalve-installation
pipeline
1m
trenching
trenchingvault-installation
excavator
1m
rebar formwork
formwork-assemblyfoundation-preparation
wood
1m
concrete work
foundation-constructionexcavation
excavator
1m
valve vault
pipe-installationvalve-installation
toolbox
1m
concrete work
tank-foundation-constructionrebar-placement
excavator
1m
pipeline installation
pipeline-installationvalve-installation
shovel
1m
concrete work
concrete-pouringfoundation-preparation
truck
1m
trenching
trenchingpipe-installation
construction-truck
1m
pipeline installation
pipeline-connectionpipe-installation
protective-wrap