No caption
IMG_0932.JPG
Details
Tuesday, October 14, 2025 · 3:01 PM
39.39143, -120.02123· 1684m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/140sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.1251
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:14
GPSDestBearing48.4318
GPSDestBearingRefTrue North
GPSHPositioningError2.8664
GPSImgDirection48.4318
GPSImgDirectionRefT
GPSSpeed0.3882
GPSSpeedRefK
GPSTimeStamp22:1:3
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-10-14T15:01:03.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.1317
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized439
SubSecTimeOriginal439
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image displays a section of a pipeline connected to a concrete vault. There is a visible red valve assembly with blue flanged connections. The setup is partially embedded in soil, suggesting ongoing or recently completed installation work. The concrete vault has a circular penetration with a pipe inserted into it.
valve-vault
soil surrounding vault and pipeline clear lighting conditions access to components appears unobstructed
No specific safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
rebar formwork
formwork-assemblyfoundation-preparation
wood
0m
rebar formwork
rebar-installationformwork-setup
wood
1m
valve vault
pipe-installationvalve-installation
toolbox
1m
concrete work
concrete-pouringfoundation-preparation
truck
1m
pipeline installation
pipeline-installationvalve-installation
shovel
1m
concrete work
foundation-constructionexcavation
excavator
1m
trenching
trenchingvault-installation
excavator
1m
survey layout
surveyingsite-layout
trimble-siteworks
1m
survey layout
site-surveyelevation-check
surveying-tool
1m
concrete work
tank-foundation-constructionrebar-placement
excavator