No caption
IMG_6908.JPG
Details
Thursday, March 27, 2025 · 9:27 AM
39.39117, -120.02151· 1677m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2801sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.9415
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:03:27
GPSDestBearing5.0778
GPSDestBearingRefTrue North
GPSHPositioningError4.9144
GPSImgDirection5.0778
GPSImgDirectionRefT
GPSSpeed1.3709
GPSSpeedRefK
GPSTimeStamp16:27:26
HostComputeriPhone 16 Pro
latitude39.3912
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0215
MeteringModePattern
ModifyDate2025-03-27T09:27:27.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.4518
Software18.4
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized169
SubSecTimeOriginal169
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A vehicle is parked on a gravel surface near a construction area with visible erosion control implemented along the edge of the pad. The surrounding environment consists of trees and mountains with clear skies. Gravel covers the parking pad, and a sediment control sock lines the border a bit away from vegetation.
swppp-erosion-control
gravel parking pad clear skies with good lighting unobstructed parking area with erosion control borders
No specific safety features such as PPE are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
site grading
site-gradingearth-moving
roller
2m
mechanical installation
component-stagingflanges
flanges
3m
site grading
site-gradinggravel
gravel
5m
site grading
site-gradingportable-toilet
5m
mechanical installation
tank-installationcrane-operation
crane
5m
other
crane-operationlifting
crane
5m
mechanical installation
crane-operationtank-installation
crane
6m
valve vault
component-stagingflange
power tool
7m
other
tank-installationcylindrical water tank
bundled pipes
7m
site grading
site-gradingland-clearing
excavator