No caption
IMG_6802.JPG
Details
Monday, March 24, 2025 · 3:29 PM
39.39121, -120.02148· 1673m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/3125sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue10.3610
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:24
GPSDestBearing47.0429
GPSDestBearingRefTrue North
GPSHPositioningError4.4418
GPSImgDirection47.0429
GPSImgDirectionRefT
GPSSpeed0.7933
GPSSpeedRefK
GPSTimeStamp22:29:48
HostComputeriPhone 16 Pro
latitude39.3912
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0215
MeteringModePattern
ModifyDate2025-03-24T15:29:49.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.6096
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized251
SubSecTimeOriginal251
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction area with leveled gravel or dirt, indicating site-grading work. A portable toilet and a waste dumpster are positioned in the background near the trees. The area is relatively open with visible tree-lined hills in the distance. No active machinery or personnel are visible in this frame.
site-grading
leveled gravel or dirt clear weather with natural daylight open and unobstructed access
No safety features are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
2m
mechanical installation
component-stagingflanges
flanges
3m
rebar formwork
rebar-stagingmaterial-prep
rebar
3m
site grading
site-gradingground-preparation
soil
4m
site grading
site-gradinggravel
gravel
4m
other
tank-installationcylindrical water tank
bundled pipes
4m
pipeline installation
pipe-stagingmaterial-delivery
skid steer loaders
4m
other
material-stagingpipes
tracked loader
5m
swppp erosion control
erosion-controlvehicle-parking
minivan
5m
site grading
site-gradingearth-moving
roller
5m
mechanical installation
lifting-operationtank-installation
crane