No caption
IMG_8020 2.JPG
Details
Friday, May 23, 2025 · 2:04 PM
39.39470, -120.02218· 1639m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1534sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.2123
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:23
GPSDestBearing209.4820
GPSDestBearingRefTrue North
GPSHPositioningError13.2623
GPSImgDirection209.4820
GPSImgDirectionRefT
GPSSpeed0.3048
GPSSpeedRefK
GPSTimeStamp21:4:16
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0222
MeteringModePattern
ModifyDate2025-05-23T14:04:16.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5828
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized744
SubSecTimeOriginal744
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a pothole utility locating area with traffic cones placed around a small excavation. A circular saw is positioned next to a cone on the left side. The pavement has white utility markings indicating the location of underground utilities.
excavation
paved surface with excavation clear day with natural sunlight vehicles parked close to work area, moderate access
Safety features like traffic cones are visible, delineating the work area.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
other
gongroof
2m
excavation
pothole-utility-locatingdepth-measurement
hand-held saw
2m
inspection documentation
soil-compaction-testingmeasurement-taking
compaction-machine
2m
pipeline installation
pipeline-installationtrenching
drill
2m
trenching
utility-potholingdepth-measurement
tape-measure
2m
paving surface restoration
surface-restorationtrench-inspection
plate-compactor
2m
trenching
trenchingduct-bank-excavation
tracked construction machinery
3m
site grading
soil-compactionroad-work
plate-compactor
3m
trenching
trenchingtrench
conduit pipes
4m
trenching
trenchingpipeline-prep
shovel