No caption
IMG_7976 2.JPG
Details
Friday, May 23, 2025 · 8:44 AM
39.39466, -120.02130· 1653m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/612sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.7641
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:23
GPSDestBearing3.2102
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection3.2102
GPSImgDirectionRefT
GPSSpeed0.1825
GPSSpeedRefK
GPSTimeStamp15:44:44
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-05-23T08:44:45.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.2574
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized285
SubSecTimeOriginal285
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a person standing near a pothole holding a measuring tape extended into the hole. The measurement is being taken on an asphalt road, with traffic cones placed nearby. The surrounding soil is disturbed and gravel is present at the edge of the pothole. The image is taken in daylight with visible trees and houses in the background.
excavation
asphalt road with exposed ground and gravel clear daylight open roadside with cones indicating controlled area
Traffic cones are visible providing minimal safety controls; additional PPE is not visible.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
trenchingexcavation-work
excavator
2m
site grading
site-preparationearthworks
tracked-loader
2m
excavation
pothole-utility-locatingmeasuring-depth
measuring-tape
4m
excavation
pothole-utility-locatingpothole
bucket
4m
pipeline installation
trenchingconduit-installation
conduits
5m
trenching
trenchingsoil excavation
excavator
5m
trenching
trenchingconduit-installation
shovel
5m
excavation
pothole-utility-locatingutility-excavation
loose-gravel
5m
excavation
pothole-utility-locatingtraffic-cones
loader
5m
pipeline installation
pipeline-installationtrench-work
construction machinery