No caption
IMG_1701.JPG
Details
Friday, November 21, 2025 · 12:06 PM
39.39472, -120.02098· 1671m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1292sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.8756
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:11:21
GPSDestBearing264.8223
GPSDestBearingRefTrue North
GPSHPositioningError33.9923
GPSImgDirection264.8223
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:6:31
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0210
MeteringModePattern
ModifyDate2025-11-21T12:06:33.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.3354
Software26.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized622
SubSecTimeOriginal622
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Construction personnel are engaged in trenching along a dirt roadway next to a building. A mini excavator is positioned on the right side, operated by a worker with a hard hat. Another worker is in the trench, which is marked with cones and caution tape, indicating safety precautions. The trench contains soil and some visible piping.
trenching
dirt trench with surrounding soil clear weather with natural lighting equipment access via dirt road
Safety controls including cones and caution tape are in place around the open trench.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
site grading
site-gradingland-preparation
excavators
1m
paving surface restoration
surface-compactionroad-restoration
walk-behind-compactor
1m
pipeline installation
trenchingpipeline-installation
excavator
1m
trenching
trenchingutility-work
shovel
1m
trenching
trenchingexcavation
excavator
2m
trenching
trenchingduct-bank-installation
compactor
2m
survey layout
survey-layoututility-marking
2m
trenching
trenchingconduit-laying
excavator
2m
trenching
trench-inspectionsite-preparation
excavator
2m
survey layout
utility-markingsurvey-layout