No caption
IMG_8700.JPG
Details
Wednesday, July 9, 2025 · 3:12 PM
39.39072, -120.02134· 1684m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/5155sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue10.6113
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:09
GPSDestBearing141.2909
GPSDestBearingRefTrue North
GPSHPositioningError2.5676
GPSImgDirection141.2909
GPSImgDirectionRefT
GPSSpeed1.1242
GPSSpeedRefK
GPSTimeStamp22:12:6
HostComputeriPhone 16 Pro
latitude39.3907
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-07-09T15:12:07.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.3317
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized511
SubSecTimeOriginal511
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a section of the SWPPP area with various materials placed on the ground. A roll of fencing is positioned against a temporary mesh fence, next to a large cardboard box and plastic sheeting. The scene includes vegetation and dirt, indicating an outdoor construction environment.
swppp-erosion-control
dirt with sparse vegetation bright sunny unobstructed laydown area
Safety barriers like mesh fencing are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
3m
swppp erosion control
erosion-control-stagingerosion-control-blankets
erosion control blankets
5m
swppp erosion control
erosion-controlexcavation
dump-truck
6m
other
stagingmaterial-storage
gravel
7m
site grading
site-gradingsoil-compaction
excavator
7m
site grading
site-gradingearth-moving
excavator
7m
swppp erosion control
erosion-controlswppp-implementation
bulldozer
7m
swppp erosion control
rainfall-measurementerosion-control-monitoring
rain-gauge
7m
inspection documentation
precipitation-measurementrain-gauge
rain-gauge
8m
site grading
equipment-stagingconcrete-blocks
excavator
8m
swppp erosion control
rainfall-monitoringswppp-measure
rain-gauge