No caption
IMG_2776.JPG
Details
Friday, January 30, 2026 · 1:37 PM
39.39197, -120.02203· 1643m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1883sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.8121
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2026:01:30
GPSDestBearing289.6119
GPSDestBearingRefTrue North
GPSHPositioningError18.7032
GPSImgDirection289.6119
GPSImgDirectionRefT
GPSSpeed0.6662
GPSSpeedRefK
GPSTimeStamp21:37:49
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0220
MeteringModePattern
ModifyDate2026-01-30T13:37:50.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.8790
Software26.2.1
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized846
SubSecTimeOriginal846
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a slope covered with orange wood chips and multiple wattles for erosion control. Erosion control blankets are rolled out at the bottom of the slope. In the background, a train is passing on adjacent railway tracks. The positioning indicates recent installation of erosion control measures as part of SWPPP compliance.
swppp-erosion-control
slope with wood chips clear weather with daylight open area near railway tracks
No specific safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
5m
site grading
site-gradingaccess-path
6m
trenching
caution-tape-placementcaution-tape
7m
trenching
trenchingpipe-exposure
blue-pipes
7m
trenching
manual-excavationtrenching
shovel
7m
trenching
trenchingexcavation-work
soil
7m
trenching
trenchingpipeline-installation
off-road-vehicle
7m
trenching
trenchingpipes
blue pipes
8m
trenching
trenchingsite-grading
8m
swppp erosion control
erosion-controlerosion-control-mat
digger
8m
trenching
trenchingpipeline-inspection
soil