No caption
IMG_0447.JPG
Details
Tuesday, September 23, 2025 · 3:02 PM
39.39703, -120.02012· 1694m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/3891sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue10.2119
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:23
GPSDestBearing69.7032
GPSDestBearingRefTrue North
GPSHPositioningError8.6706
GPSImgDirection69.7032
GPSImgDirectionRefT
GPSSpeed0.5459
GPSSpeedRefK
GPSTimeStamp22:2:13
HostComputeriPhone 16 Pro
latitude39.3970
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0201
MeteringModePattern
ModifyDate2025-09-23T15:02:14.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.9259
Software26.0
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized429
SubSecTimeOriginal429
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a trench with gravel filling and a vertical pipe visible at the bottom. Several orange cones and caution tape surround the trench, indicating safety measures. The area appears to be part of a larger excavation near a concrete barrier. A shadow of a person taking the photo is prominent in the foreground.
trenching
gravel and earth sunny and bright safety perimeter with caution tape and cones
Safety controls such as cones and caution tape are visible around the open trench.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trench-workconcrete-placement
concrete-tank
1m
excavation
excavationtrenching
excavator
2m
trenching
trenchingexcavation-activity
tracked-excavator
2m
other
site-securityarea-protection
fencing
2m
excavation
drillingrock-breaking
jackhammer
2m
other
equipment-stagingmetal-bar
equipment tracks
3m
trenching
trenchingexcavation
excavator
3m
other
excavator-operationload-lifting
excavator
3m
excavation
excavationsite-safety
concrete structure
4m
pipeline installation
pipeline-installationpipe-alignment
spirit-level