Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3378sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.4058
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:09:26
GPSDestBearing114.8503
GPSDestBearingRefTrue North
GPSHPositioningError196.7198
GPSImgDirection114.8503
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:38:3
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-09-26T14:38:06.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.7221
Software26.0
SubjectArea{"0":2011,"1":1507,"2":1107,"3":662}
SubSecTimeDigitized270
SubSecTimeOriginal270
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A concrete structure is partially buried in the ground with a green pipe entering it at the lower section. The structure has labels including 'Jensen' and 'NPCA Certified Plant'. The surrounding area appears to be unpaved soil, with some gravel visible at the base of the structure. No active installation work is visibly happening at the moment.
pipeline-installation
unpaved soil with some gravel clear and sunny lighting conditions open access without visible congestion
No safety features are visible in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
valve vault
vault-installationpipeline-connection
mini excavator
1m
site grading
site-gradingformwork-staging
wood
2m
rebar formwork
formwork-constructiontank-base-construction
wooden-planks
2m
valve vault
valve-vault-installationpipeline-connection
concrete
2m
trenching
duct-bank-installationtrenching
excavator
2m
site grading
gradingsite-preparation
excavator
2m
valve vault
valve-vault-installationpipeline-connection
excavator
2m
trenching
trenchingtrench
soil
3m
site grading
gradingfoundation-preparation
excavator
3m
site grading
gravel-spreadingfoundation-preparation
excavator