No caption
IMG_7701.JPG
Details
Friday, May 9, 2025 · 12:10 PM
39.39156, -120.02159· 1669m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1855sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.3235
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:09
GPSDestBearing96.9594
GPSDestBearingRefTrue North
GPSHPositioningError20.5936
GPSImgDirection96.9594
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp19:10:33
HostComputeriPhone 16 Pro
latitude39.3916
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-05-09T12:10:34.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.8574
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized048
SubSecTimeOriginal048
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavator positioned on a slope, performing site grading activities. There are visible track marks on the dirt surface, suggesting recent movement of earth. Wooden supports are tied to nearby trees, possibly for stabilization. The setting is a hilly area with several trees and shrubs.
site-grading
dirt surface with track marks sunny and clear no visible obstructions indicated
No specific safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingconduit-installation
gravel
2m
trenching
trenchingutility-trench
soil
2m
site grading
site-gradingerosion-control
orange machinery
2m
trenching
trenchinggravel
gravel
2m
trenching
trenchingsoil
gravel
2m
site grading
site-gradingdirt-path
2m
trenching
trenchingutility-installation
gravel
3m
trenching
trenchingexcavation-process
excavator
3m
trenching
trenchingexcavator
excavator
3m
pipeline installation
pipe-installationutility-work
rock