No caption
IMG_8127.JPG
Details
Thursday, May 29, 2025 · 11:40 AM
39.39296, -120.02268· 1622m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2611sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.2929
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:29
GPSDestBearing193.3771
GPSDestBearingRefTrue North
GPSHPositioningError11.6211
GPSImgDirection193.3771
GPSImgDirectionRefT
GPSSpeed0.2461
GPSSpeedRefK
GPSTimeStamp18:40:47
HostComputeriPhone 16 Pro
latitude39.3930
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-05-29T11:40:47.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.3504
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized385
SubSecTimeOriginal385
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers are seen in a trench with one using a shovel to work with the soil. Several PVC pipes are laid out in the trench, possibly positioned for installation. The surrounding area consists of uneven earth, likely from excavation activities. One worker appears to be preparatory or in-progress with arranging the pipes.
trenching
soil and earthen trench sunny moderate space for pipe staging
PPE including hard hats and hi-vis vests are worn; open trench present.
Analyzed Apr 21, 2026
Nearby Photos
2m
pipeline installation
conduit-installationtrench-work
bulldozer
2m
site grading
site-gradinggrading
below-ground vehicle
2m
demolition
pipe-removalrusted-materials
construction-vehicle
2m
trenching
trenchingexcavation
excavator
2m
pipeline installation
pipe-layingtrench-preparation
shovel
3m
pipeline installation
conduit-installationtrenching
shovel
4m
pipeline installation
hydrant-installationtrenching
excavator
4m
pipeline installation
fire-hydrant-installationpiping
gravel
5m
trenching
trenchingmeasurement
excavator
5m
site grading
soil-compactionsite-preparation
compactor