No caption
IMG_0808.JPG
Details
Thursday, October 9, 2025 · 8:51 AM
39.39297, -120.02263· 1690m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.6929
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:09
GPSDestBearing332.2474
GPSDestBearingRefTrue North
GPSHPositioningError102.4943
GPSImgDirection332.2474
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp15:51:55
HostComputeriPhone 16 Pro
latitude39.3930
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-10-09T08:51:57.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.0.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized982
SubSecTimeOriginal982
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers are standing in an open trench, using measuring tools. Gravel is partially filling the trench. A dump truck is on the left side, and a small excavator is on the upper right corner. The area is surrounded by trees and mountains, suggesting a remote location.
trenching
trench with gravel clear daylight open ground with clear access
PPE including hard-hats, hi-vis vests, and work boots are visible, but no additional safety controls are seen.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
site grading
soil-compactionsite-preparation
compactor
2m
pipeline installation
conduit-installationtrenching
shovel
3m
site grading
site-gradinggrading
below-ground vehicle
3m
pipeline installation
pipe-layingtrench-preparation
shovel
4m
pipeline installation
conduit-installationtrench-work
bulldozer
5m
trenching
trenchingpipe-preparation
shovel
5m
demolition
pipe-removalrusted-materials
construction-vehicle
6m
excavation
excavationsurvey-setup
excavator
6m
backfill
backfillingsoil-compaction
plate-compactor
6m
trenching
trenchingexcavation
excavator