IMG_9355.JPG

No caption

IMG_9355.JPG

Tags

Details

Monday, August 11, 2025 · 11:15 AM

39.39467, -120.02161· 1649m

Location Context

1 / 5

USGS Topo

No elevation data

FEMA Flood

No flood data

OSM Infra

No address data

USDA Soil

No soil data

USGS Hydro

No hydro data

Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1235sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.0593
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:08:11
GPSDestBearing53.9593
GPSDestBearingRefTrue North
GPSHPositioningError18.2879
GPSImgDirection53.9593
GPSImgDirectionRefT
GPSSpeed1.0243
GPSSpeedRefK
GPSTimeStamp18:15:32
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-08-11T11:15:33.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.2698
Software18.6
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized313
SubSecTimeOriginal313
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72

AI Analysis

The image shows two workers in a trench, installing what appears to be multiple conduits. The trench runs alongside a paved area and a hydraulic excavator is parked nearby. The ground surface appears cracked and uneven. Soil is piled on one side of the trench, with some tools visible on the ground.

pipeline-installation
cracked and uneven paved surface with open trench daylight with clear weather trench alongside paved access area
No specific safety controls visible in frame apart from PPE like hi-vis vests.

Analyzed Apr 21, 2026