No caption
IMG_8565.JPG
Details
Wednesday, July 2, 2025 · 12:01 PM
39.39419, -120.02322· 1579m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3279sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.2768
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:07:02
GPSDestBearing196.4080
GPSDestBearingRefTrue North
GPSHPositioningError44.4080
GPSImgDirection196.4080
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp19:1:16
HostComputeriPhone 16 Pro
latitude39.3942
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0232
MeteringModePattern
ModifyDate2025-07-02T12:01:17.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.6789
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized544
SubSecTimeOriginal544
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an active trenching operation with multiple pieces of heavy machinery. Conduits are being laid in an open trench along a dirt path surrounded by vegetation. A mini excavator is present near the trench, which appears to be in the process of being backfilled. The presence of conduit suggests pipeline or duct installation work.
pipeline-installation
dirt path with trench sunny conditions open dirt path with clearance for equipment
Safety features like barriers or caution tape are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
16m
trenching
trenchingexcavation
excavator
17m
site grading
site-gradingearth-movement
compact track loader
17m
trenching
trenchingexcavation-work
excavator
18m
trenching
trenchingpipeline-installation
excavator
18m
backfill
backfillshoveling
shovel
18m
trenching
trenchingexcavation-work
excavator
20m
pipeline installation
pipe-layingtrench-work
shovel
20m
trenching
trenchingland-clearing
excavator
20m
excavation
excavationutility-trenching
excavator
23m
trenching
trenchingexcavation-work
excavator