No caption
IMG_1869.JPG
Details
Friday, December 5, 2025 · 4:40 PM
39.32629, -120.20245
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
AI Analysis
The image shows a partially installed underground valve vault with concrete forms in place. The trench is excavated, and gravel bedding is present at the base. Copper pipe fittings and valves are visible inside the vault, indicating mid-construction phase for water utility infrastructure work.
valve-vault
Mid-construction phase with excavated trench and new valve vault installation. Soil is excavated and compacted, daylight conditions are favorable for work.
Work boots visible on personnel, no other safety equipment visible in frame.
Equipment & Materials
AI Tags
Analyzed Mar 11, 2026
Nearby Photos
2m
excavation
trench-excavationunderground-utility
trench box
2m
pipeline installation
utility-workpipeline-installation
tripod
4m
valve vault
valve-vaulttrench-excavation
concrete valve vault
5m
excavation
trench-excavationcompaction
John Deere 35G compact excavator
5m
excavation
underground-utilitytrench-excavation
John Deere mini excavator
6m
excavation
trench-excavationgravel-backfill
excavator bucket
7m
pipeline installation
underground-utilitiespvc-pipe
tripod
7m
excavation
trench-excavationutility-installation
Allmand Light Tower
8m
excavation
trench-excavationladder
6-foot aluminum extension ladder
8m
pipeline installation
trench-excavationpipeline-installation
light tower generator