No caption
IMG_0563.JPG
Details
Tuesday, September 30, 2025 · 10:58 AM
39.39218, -120.02242· 1574m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/493sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue2.9709
BrightnessValue8.3121
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0027
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat120
GPSDateStamp2025:09:30
GPSDestBearing95.4997
GPSDestBearingRefTrue North
GPSHPositioningError35.3836
GPSImgDirection95.4997
GPSImgDirectionRefT
GPSSpeed2.5678
GPSSpeedRefK
GPSTimeStamp17:58:42
HostComputeriPhone 16 Pro
latitude39.3922
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0224
MeteringModePattern
ModifyDate2025-09-30T10:58:42.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.9457
Software26.0
SubjectArea{"0":2008,"1":1492,"2":2224,"3":1331}
SubSecTimeDigitized883
SubSecTimeOriginal883
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers are positioned in a trench connecting or positioning piping materials. They wear hi-vis clothing and hard hats. A large blue pipe is prominently placed in the trench, indicating ongoing piping work. A yellow and black tool box is visible near the trench edge. The trench is surrounded by rocky and uneven ground.
pipeline-installation
rocky soil cloudy daylight tight trench space with limited access
Standard PPE such as hard hats and hi-vis vests are visible; open trench presents potential hazards.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
4m
demolition
stagingmaterial-storage
logs
6m
site grading
site-gradingearth-moving
bulldozer
6m
pressure testing
pressure-testingpressure-gauge
pressure-gauge
6m
pipeline installation
pipeline-installationpressure-testing
pressure-gauge
6m
pressure testing
pressure-testingpressure-gauge
pressure-gauge
6m
pressure testing
pressure-testingpipe-installation
pressure-gauge
6m
trenching
trenchingexcavation-activity
soil
7m
pipeline installation
duct-bank-installationpvc-conduits
pvc-conduits
8m
pipeline installation
flange-installationpipe-connection
flanges
8m
trenching
trenchingpipeline-installation
excavator