No caption
IMG_9910.JPG
Details
Thursday, September 4, 2025 · 8:38 AM
39.39464, -120.02263· 1638m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/138sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.3725
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:09:04
GPSDestBearing359.8602
GPSDestBearingRefTrue North
GPSHPositioningError8.1869
GPSImgDirection359.8602
GPSImgDirectionRefT
GPSSpeed0.0542
GPSSpeedRefK
GPSTimeStamp15:38:50
HostComputeriPhone 16 Pro
latitude39.3946
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-09-04T08:38:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.1072
Software18.6.2
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized075
SubSecTimeOriginal075
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers are present in an open trench, one standing and the other kneeling. A large pipe is laid in the trench, connected to other components. Traffic cones are set up around the trench as a safety measure. The surrounding area consists of disturbed soil and pavement edges, indicating ongoing construction.
pipeline-installation
disturbed soil and pavement daylight open trench with limited access
PPE is worn by workers and cones mark the trench edge.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
boulder-removalexcavation
excavator
1m
pipeline installation
pipeline-installationtool-usage
wrench
1m
excavation
utility-locatingtrenching
pipe
1m
trenching
trenchingconduit-installation
mini excavator
1m
trenching
trenchingexcavation
mini excavator
2m
excavation
rock-liftingexcavation-work
excavator
2m
pipeline installation
pipe-fittingtrench-work
plate-compactor
2m
pipeline installation
pipeline-installationpipe-fitting
excavator
2m
trenching
trenchingsafety-measures
shovel
2m
excavation
jackhammeringconcrete-breaking
excavator