No caption
IMG_0271.JPG
Details
Thursday, September 18, 2025 · 2:29 PM
39.39274, -120.02277· 1653m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/901sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.7455
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:18
GPSDestBearing185.0866
GPSDestBearingRefTrue North
GPSHPositioningError35.9791
GPSImgDirection185.0866
GPSImgDirectionRefT
GPSSpeed0.9940
GPSSpeedRefK
GPSTimeStamp21:29:47
HostComputeriPhone 16 Pro
latitude39.3927
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0228
MeteringModePattern
ModifyDate2025-09-18T14:29:48.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.8152
Software26.0
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized554
SubSecTimeOriginal554
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts two pipelines installed parallel in an open trench running through a mountainous area. The trench is dug into a dirt path, surrounded by rugged terrain with trees. The trench appears to have been recently excavated, and the pipes are connected with flanged ends visible. There is no visible heavy construction equipment in the immediate frame.
pipeline-installation
dirt trench in mountainous area overcast or cloudy lighting no visible access issues in frame
No specific PPE or safety controls are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
5m
trenching
trenchingconduit-installation
conduit
6m
site grading
grading-workearth-moving
bulldozer
6m
trenching
trenchingexcavation-work
excavators
8m
site grading
site-gradingearth-moving
bulldozer
9m
excavation
excavationrock-moving
excavator
9m
swppp erosion control
erosion-controlrunoff-management
mulch
9m
excavation
excavationland-clearing
excavator
9m
trenching
trenchingcompaction
excavators
10m
site grading
water-sprayingdust-control
water-truck
10m
trenching
trenchingexcavation
excavator