No caption
IMG_0850.JPG
Details
39.39274, -120.02249· 1635m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Show all EXIF (43 fields)
AI Analysis
The image shows a worker in a bright green shirt near a vertical pipeline section that appears to be newly placed or secured. The area around the pipe base is filled with aggregate material and concrete. Wooden bracing is visible across the trench, providing stability. A wire or hose is connected to the pipeline, and the worker is handling it, suggesting ongoing adjustments or alignments.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
pipeline installation
3m
trenching
4m
trenching
4m
excavation
4m
excavation
4m
excavation
4m
excavation
5m
pipeline installation
5m
survey layout
5m
pipeline installation