No caption
IMG_0834.JPG
Details
Friday, October 10, 2025 · 8:14 AM
39.39142, -120.02126· 1679m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/146sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue6.0410
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:10
GPSDestBearing238.4927
GPSDestBearingRefTrue North
GPSHPositioningError5.1186
GPSImgDirection238.4927
GPSImgDirectionRefT
GPSSpeed1.3144
GPSSpeedRefK
GPSTimeStamp15:14:37
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-10-10T08:14:38.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.1947
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized939
SubSecTimeOriginal939
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two overflow pipes from a finished water tank are shown leading to a grated area. The image includes a blue hand-operated valve attached to one of the pipes. The setup is located outdoors with vehicles and equipment in the background. The scene suggests recent or ongoing mechanical work around the overflow system.
mechanical-installation
compacted dirt and gravel clear weather with good visibility open area with accessible staging
Hi-vis clothing is visible; no specific safety controls are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
mechanical installation
mechanical-connectionpipe-installation
pickup-truck
1m
pipeline installation
pipe-installationfitting-adjustment
tool-case
1m
trenching
trenchingcompaction
shovel
1m
site grading
gradingsite-preparation
excavator
1m
trenching
trenchingtrench
soil
1m
valve vault
valve-installationtrench-work
excavator
1m
pipeline installation
pipe-installationtrenching-work
shovel
2m
site grading
gradingfoundation-preparation
excavator
2m
site grading
gravel-spreadingfoundation-preparation
excavator
2m
rebar formwork
formwork-assemblyrebar-placement
gravel