No caption
IMG_9607.JPG
Details
Thursday, August 21, 2025 · 11:15 AM
39.39453, -120.02287· 1646m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/371sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.9709
BrightnessValue7.8206
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat120
GPSDateStamp2025:08:21
GPSDestBearing9.4625
GPSDestBearingRefTrue North
GPSHPositioningError39.5233
GPSImgDirection9.4625
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:15:38
HostComputeriPhone 16 Pro
latitude39.3945
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0229
MeteringModePattern
ModifyDate2025-08-21T11:15:41.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.5344
Software18.6.1
SubjectArea{"0":1999,"1":1521,"2":2204,"3":1333}
SubSecTimeDigitized653
SubSecTimeOriginal653
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trenching activity with one worker inside the trench managing a pipe section and another worker operating an excavator. The excavator is positioned at the trench edge, lifting soil. A shovel is also seen leaning against the trench wall. The visible pipe section, green in color, is temporarily placed within the trench.
trenching
trench in soil beside a paved surface clear daylight conditions appears open and accessible
Visible safety features include PPE such as hard hats, hi-vis vests, and work boots. The open trench presents a visible hazard without additional controls.
Analyzed Apr 21, 2026
Nearby Photos
6m
trenching
trenchingconduit-installation
excavator
7m
trenching
trenchingexcavation
excavator
8m
trenching
trenchingutility-conduit-installation
backhoe
8m
backfill
soil-compactiontrench-work
vibrating-compactor
10m
excavation
pothole-utility-locatingexcavation
soil
11m
trenching
trenchingconduit-installation
excavator
11m
trenching
trenchingexcavation-work
shovel
12m
paving surface restoration
equipment-stagingpaving-preparation
compactor
12m
excavation
pothole-utility-locatingdepth-measurement
tape-measure
12m
excavation
excavationtrenching
excavator