No caption
IMG_9586.JPG
Details
Wednesday, August 20, 2025 · 3:29 PM
39.39441, -120.02239· 1642m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/5714sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.2050
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:20
GPSDestBearing359.2798
GPSDestBearingRefTrue North
GPSHPositioningError46.6336
GPSImgDirection359.2798
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:29:44
HostComputeriPhone 16 Pro
latitude39.3944
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0224
MeteringModePattern
ModifyDate2025-08-20T15:29:46.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.4804
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized319
SubSecTimeOriginal319
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench being dug on a construction site, with two workers wearing protective gear. Traffic cones are placed around the trench, and the surface is a mix of gravel and dirt. A worker is operating a saw on the pavement edge near the trench. The trench appears to be part of utility work, with blue markers indicating possible utility lines.
trenching
mix of gravel, dirt, and pavement clear daylight conditions open trench area with some equipment and delineation
Traffic cones and PPE visible; open trench identified as a hazard.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
7m
trenching
trench-inspectionroadway-trenching
hand-tool
7m
valve vault
vault-inspectioncomponent-adjustment
vault-lid
8m
pipeline installation
pipe-installationtrench-work
duct-tape
8m
paving surface restoration
asphalt-patchingsafety-precautions
white van
9m
paving surface restoration
site-preparationequipment-staging
pavement-saw
9m
trenching
trenchingsoil
9m
other
dirt-roadtraffic-cone
RV
9m
trenching
trenchingconduit-installation
cordless drill
10m
trenching
trench-levelingmaterial-preparation
excavator
11m
trenching
trenchingexcavation
excavator