No caption
IMG_8940.JPG
Details
Tuesday, July 22, 2025 · 11:02 AM
39.39385, -120.02311· 1631m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1018sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.6910
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:07:22
GPSDestBearing182.8440
GPSDestBearingRefTrue North
GPSHPositioningError33.4560
GPSImgDirection182.8440
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:2:55
HostComputeriPhone 16 Pro
latitude39.3939
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0231
MeteringModePattern
ModifyDate2025-07-22T11:02:56.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.9920
Software18.6
SubjectArea{"0":2849,"1":2137,"2":3291,"3":1884}
SubSecTimeDigitized714
SubSecTimeOriginal714
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A worker in a hi-vis vest and hard hat is standing inside an open trench alongside two parallel blue pipes. A trenching tool is visible near the worker, and a piece of machinery is in the background. The ground is comprised of dirt and there is no visible safety barrier around the trench.
pipeline-installation
dirt soil with open trench daylight, overcast open access, no visible congestion
PPE is visible, but no safety barriers are present in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
4m
trenching
trenchingexcavation-activity
excavator
5m
trenching
trenchingutility-installation
excavators
7m
trenching
trenchingpipe-installation
excavator
8m
site grading
site-gradingpathway-preparation
pickup-truck
12m
trenching
trenchingconduit-installation
visible excavator
14m
pipeline installation
vault-installationcompacting
utility-vehicle
14m
trenching
trenchingduct-bank-installation
excavator
16m
other
tapinggroundwork
duct-tape
20m
electrical
access-box-inspectionaccess-box
compact utility vehicle
20m
trenching
pipe-handlingtrench-preparation
bulldozer