No caption
IMG_8889.JPG
Details
Friday, July 18, 2025 · 2:48 PM
39.39324, -120.02267· 1630m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2024sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.5909
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:18
GPSDestBearing4.4830
GPSDestBearingRefTrue North
GPSHPositioningError16.4603
GPSImgDirection4.4830
GPSImgDirectionRefT
GPSSpeed1.0170
GPSSpeedRefK
GPSTimeStamp21:48:33
HostComputeriPhone 16 Pro
latitude39.3932
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-07-18T14:48:34.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.9832
Software18.6
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized184
SubSecTimeOriginal184
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench alongside a dirt road, possibly for installing underground utilities. Two bluish pipes are laid in the trench near what appears to be a vertical metal rod. The surrounding area is rural with trees and dry vegetation in the background.
trenching
dry soil and rocky trench walls clear skies with bright sunlight open rural area with access road beside trench
Safety features are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipeline-work
hand tool visible
1m
pipeline installation
trenchingpipeline-installation
excavator
1m
trenching
compactiontrench-work
compaction-tool
1m
pipeline installation
pipeline-installationtrenching
excavator
2m
trenching
trenchingexcavation-work
excavator
2m
pipeline installation
pipe-installationvalve-connection
yellow drill
2m
pipeline installation
pipeline-installationtrenching
mini-excavator
2m
pipeline installation
pipeline-installationvalve-adjustment
pipes
2m
trenching
trenchingexcavation
backhoe-loader
3m
trenching
trenchingexcavation
excavator