No caption
IMG_7466.JPG
Details
Wednesday, April 30, 2025 · 1:35 PM
39.39161, -120.02172· 1667m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2494sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.0611
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:04:30
GPSDestBearing114.8326
GPSDestBearingRefTrue North
GPSHPositioningError13.4459
GPSImgDirection114.8326
GPSImgDirectionRefT
GPSSpeed0.8772
GPSSpeedRefK
GPSTimeStamp20:35:24
HostComputeriPhone 16 Pro
latitude39.3916
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModeSpot
ModifyDate2025-04-30T13:35:25.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.2841
Software18.5
SubjectArea{"0":3069,"1":975,"2":747,"3":749}
SubSecTimeDigitized474
SubSecTimeOriginal474
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A worker wearing a hard hat and hi-vis vest is operating a plate compactor in a trench. The trench runs along a slope with loose soil and rocky terrain. An excavator is partially visible in the upper section of the image. The area is surrounded by natural vegetation, and utility poles are present.
trenching
loose soil and rocky trench daylight, mostly clear slope with natural vegetation
PPE is visible on the worker, but no additional safety controls are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
6m
site grading
gradingsite-preparation
dirt
7m
trenching
trenchingpipe-laying
soil
7m
trenching
trenchingtrench
7m
trenching
trenchingexcavation
excavator
8m
backfill
soil-compactionexcavation-preparation
excavator
8m
trenching
pipe-installationtrench-work
soil
8m
pipeline installation
trenchingpipe-installation
toolbox
8m
trenching
soil-levelingpipe-preparation
leveling-tool
9m
pipeline installation
pipe-installationtrench-work
hand-tools
9m
electrical
conduit-stub-outelectrical-installation
pvc-conduit