No caption
IMG_2654.JPG
Details
Monday, January 26, 2026 · 3:52 PM
39.39446, -120.02250· 1646m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/299sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue5.9938
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:26
GPSDestBearing9.0677
GPSDestBearingRefTrue North
GPSHPositioningError37.0822
GPSImgDirection9.0677
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp23:52:44
HostComputeriPhone 16 Pro
latitude39.3945
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0225
MeteringModePattern
ModifyDate2026-01-26T15:52:45.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.2259
Software26.2
SubjectArea{"0":2861,"1":2142,"2":3146,"3":1883}
SubSecTimeDigitized021
SubSecTimeOriginal021
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an open trench alongside a paved road, with blue pipes laid in or near the trench. A backhoe loader is present on the road, assisting with the trenching work. Multiple traffic cones are used along the trench for safety. Workers are visible wearing appropriate safety gear such as hard hats and hi-vis vests.
trenching
exposed soil in trench, paved road surface clear daytime lighting access appears partially restricted by cones
Safety measures visible include traffic cones marking the trench and workers wearing PPE.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
4m
pipeline installation
pipe-installationtrench-work
duct-tape
4m
trenching
trench-inspectionroadway-trenching
hand-tool
4m
trenching
trenchingpipeline-staging
loader
4m
trenching
trenchingconduit-installation
excavator
4m
trenching
trenchingsoil
5m
paving surface restoration
asphalt-patchingsafety-precautions
white van
6m
other
utility-inspectionpropane-tank
service-truck
7m
trenching
trenchingexcavation
loader
8m
site grading
road-gradingsurface-preparation
construction vehicle
8m
valve vault
vault-inspectioncomponent-adjustment
vault-lid