No caption
IMG_7048.JPG
Details
Tuesday, April 8, 2025 · 1:05 PM
39.39136, -120.02118· 1683m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2169sISO 100
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.1261
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:08
GPSDestBearing238.3044
GPSDestBearingRefTrue North
GPSHPositioningError4.7485
GPSImgDirection238.3044
GPSImgDirectionRefT
GPSSpeed0.1658
GPSSpeedRefK
GPSTimeStamp20:5:41
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-04-08T13:05:41.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.0829
Software18.4
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized634
SubSecTimeOriginal634
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image displays rebar positioned for formwork within a wooden structure, suggesting ongoing foundation preparation. Several metal rebars are vertically and horizontally arranged, held in place by the wooden formwork. The tape measure indicates the spacing between rebar. The setting is outdoors with a gravel ground surface.
rebar-formwork
gravel sunny and bright lighting open access with no visible obstructions
Safety features such as PPE or barriers are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
concrete work
concrete-pouringrebar-placement
concrete-hose
1m
concrete work
concrete-pouringformwork-installation
concrete-truck
1m
concrete work
concrete-pouringformwork-setup
truck
1m
rebar formwork
rebar-installationformwork-assembly
rebar
1m
rebar formwork
rebar-placementformwork-setup
tape-measure
1m
rebar formwork
rebar-installationrebar
rebar
1m
rebar formwork
tank-foundationrebar-installation
construction tools
2m
concrete work
formwork-installationfoundation-preparation
wooden-bracing
2m
swppp erosion control
erosion-controlsite-preparation
gravel
2m
concrete work
formwork-constructionfoundation-preparation
wood