No caption
IMG_7150.JPG
Details
Friday, April 11, 2025 · 3:36 PM
39.39149, -120.02119· 1672m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1795sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.3831
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:11
GPSDestBearing120.7612
GPSDestBearingRefTrue North
GPSHPositioningError5.6395
GPSImgDirection120.7612
GPSImgDirectionRefT
GPSSpeed0.5014
GPSSpeedRefK
GPSTimeStamp22:36:7
HostComputeriPhone 16 Pro
latitude39.3915
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-04-11T15:36:08.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.8100
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized040
SubSecTimeOriginal040
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a circular arrangement of wooden formwork and rebar, indicating preparation for a tank foundation. This setup is located outdoors with surrounding trees visible. The formwork consists of dense wooden supports, while the rebar is placed in a grid pattern within the form. This suggests ongoing foundation work for a tank structure.
rebar-formwork
earth with exposed soil clear daylight conditions open with natural terrain
No safety features are visible in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
rebar formwork
formwork-constructionrebar-installation
wood
1m
rebar formwork
rebar-placementformwork-construction
wood
1m
mechanical installation
mechanical-installationpipeline-flange
flange
1m
other
liftingmaterial-handling
excavator
2m
concrete work
concrete-pouringformwork-assembly
pickup-truck
2m
other
paintingcoating-application
boom-lift
2m
concrete work
tank-foundation-preparationconcrete-pad
water tanker truck
2m
trenching
trenchingexcavation-activity
excavator
2m
rebar formwork
formwork-assemblyfoundation-preparation
excavator
2m
mechanical installation
lifting-operationinstallation-work
excavator