No caption
IMG_6761.JPG
Details
Friday, March 21, 2025 · 3:03 PM
39.39137, -120.02123· 1685m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1339sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.0902
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:21
GPSDestBearing62.3672
GPSDestBearingRefTrue North
GPSHPositioningError3.0134
GPSImgDirection62.3672
GPSImgDirectionRefT
GPSSpeed0.6900
GPSSpeedRefK
GPSTimeStamp22:3:42
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-03-21T15:03:44.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.3866
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized306
SubSecTimeOriginal306
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a circular excavation site with wooden formwork set up around the perimeter. The interior surface is covered with gravel, and some wooden braces are supporting the formwork, suggesting preparation for a concrete pour. The site is located in a wooded area with trees visible in the background.
concrete-work
gravel-covered excavation overcast sky accessible foot traffic
No specific safety features are visible in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
concrete work
concrete-pouringfoundation-work
concrete
1m
mechanical installation
valve-installationvalve
construction-vehicles
1m
mechanical installation
valve-installationpipe-connection
loader
1m
concrete work
concrete-pourformwork-setup
concrete
2m
pipeline installation
pipeline-installationpipe-joining
pipes
2m
trenching
trenchingexcavation-activity
excavation-equipment
2m
rebar formwork
rebar-installationformwork-preparation
gravel
2m
site grading
slope-stabilizationsite-preparation
tracked excavator
2m
site grading
foundation-preparationsite-grading
excavator
2m
site grading
gravel-compactionfoundation-preparation
excavator