No caption
IMG_8043.JPG
Details
Tuesday, May 27, 2025 · 8:35 AM
39.39476, -120.02203· 1639m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/709sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.4607
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:27
GPSDestBearing59.3456
GPSDestBearingRefTrue North
GPSHPositioningError14.6525
GPSImgDirection59.3456
GPSImgDirectionRefT
GPSSpeed0.1999
GPSSpeedRefK
GPSTimeStamp15:35:31
HostComputeriPhone 16 Pro
latitude39.3948
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0220
MeteringModePattern
ModifyDate2025-05-27T08:35:32.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.4701
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized964
SubSecTimeOriginal964
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A surveying instrument on a tripod is positioned on the left side of the image, indicating survey-layout activity. Orange traffic cones are placed around a patched pothole on the asphalt road. A stone wall borders a residential property, and several vehicles are parked along the street. The scene is lit by bright sunlight, casting long shadows.
survey-layout
asphalt with patched pothole bright sunlight residential street with parked vehicles
Traffic cones are placed for safety around the survey area.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
4m
trenching
trenchingsoil
soil
4m
trenching
trenchingexcavation
excavator
4m
trenching
depth-measurementtrenching-activity
measuring-tape
5m
trenching
trenchingexcavation
excavator
5m
trenching
trench-measuringdepth-check
measuring-tape
5m
trenching
trenchingduct-bank-installation
excavator
6m
excavation
pothole-utility-locatingtrench-measurement
black SUV
6m
trenching
trenchingpipe-installation
tracked excavator
7m
excavation
rock-removalsite-excavation
excavator
7m
excavation
potholingutility-locating
measuring-tape