No caption
IMG_1673.JPG
Details
Wednesday, November 19, 2025 · 3:21 PM
39.39474, -120.02084· 1661m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 160
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue3.9104
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:11:19
GPSDestBearing257.6523
GPSDestBearingRefTrue North
GPSHPositioningError10.3972
GPSImgDirection257.6523
GPSImgDirectionRefT
GPSSpeed0.0896
GPSSpeedRefK
GPSTimeStamp23:21:28
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0208
MeteringModePattern
ModifyDate2025-11-19T15:21:29.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized112
SubSecTimeOriginal112
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An excavator is actively working in a trench, which contains visible PVC pipes. Orange cones are placed near the trench for safety. The surrounding area includes portable restrooms and concrete blocks. The terrain appears to be uneven with vegetation and mountainous background.
trenching
uneven soil surface cloudy accessible but uneven, potential congestion
Traffic cones and caution tape are used to indicate safety precautions around the trench.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingexcavation
excavator
1m
trenching
excavationboulder-moving
excavator
1m
trenching
trenchingexcavation
excavator
1m
site grading
tree-protectiongrading
soil
2m
trenching
trenchingexcavation
mini excavator
3m
trenching
trenchingexcavation
excavators
3m
trenching
trenchingexcavator-operation
excavator
3m
pipeline installation
pipeline-installationpipe-handling
hand tool
3m
excavation
excavationpavement-repair
compact track loader
3m
backfill
soil-compactionworker-operated-equipment
compactor