No caption
IMG_6913.JPG
Details
Thursday, March 27, 2025 · 10:10 AM
39.39318, -120.02220· 1632m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/726sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.0771
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:03:27
GPSDestBearing192.3681
GPSDestBearingRefTrue North
GPSHPositioningError52.3123
GPSImgDirection192.3681
GPSImgDirectionRefT
GPSSpeed1.0936
GPSSpeedRefK
GPSTimeStamp17:10:6
HostComputeriPhone 16 Pro
latitude39.3932
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0222
MeteringModePattern
ModifyDate2025-03-27T10:10:07.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.5032
Software18.4
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized093
SubSecTimeOriginal093
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The gravel access road is framed by erosion control measures such as wattles positioned along its edges. Temporary fencing is visible on the right side adjacent to a structure with a metal chimney. The setting appears to be in a forested area with sunlight creating shadows across the scene.
swppp-erosion-control
gravel surface on access road sunny with tree shadows adequate access along road
Basic erosion control measures are visible, but no PPE is worn.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
4m
site grading
site-gradingearthmoving
track-loader
10m
pipeline installation
pipe-installationtrench-work
excavator
12m
concrete work
concrete-pouringduct-bank-work
concrete-mixer-truck
13m
trenching
trenchingpipe-staging
pvc-pipes
17m
trenching
trenchingpipe-installation
piping
17m
trenching
pipe-installationtrenching
pipes
18m
other
street-cleaningmanual-sweeping
broom
19m
pipeline installation
pipe-layingtrench-work
hand tools
22m
excavation
excavationground-preparation
excavator
23m
swppp erosion control
erosion-controlswppp-compliance
straw-wattle