No caption
IMG_8222.JPG
Tags
Details
Thursday, June 5, 2025 · 9:23 AM
39.39074, -120.02104· 1686m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1339sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.3116
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:06:05
GPSDestBearing120.1082
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection120.1082
GPSImgDirectionRefT
GPSSpeed0.1715
GPSSpeedRefK
GPSTimeStamp16:23:14
HostComputeriPhone 16 Pro
latitude39.3907
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0210
MeteringModePattern
ModifyDate2025-06-05T09:23:15.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.3866
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized363
SubSecTimeOriginal363
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows several bundles of metal pipes stacked in a clearing surrounded by trees. A utility vehicle with a canopy is parked next to the stacked materials. The pipes are organized and bound, suggesting preparation for future installation. The ground appears uneven with some rocks nearby.
swppp-erosion-control
grass and dirt with uneven ground and rocks sunny with shadows from trees ample space for material staging with clear access
Safety features are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
7m
swppp erosion control
stagingmaterial-staging
truck
12m
site grading
site-gradingearth-moving
bulldozer
14m
swppp erosion control
stagingequipment-staging
excavator
16m
site grading
gradingland-preparation
excavator
19m
excavation
material-handlingrock-moving
excavator
19m
site grading
site-gradingearth-moving
excavator
19m
site grading
site-gradingsoil-compaction
excavator
19m
site grading
site-gradingearth-moving
excavator
20m
excavation
earthmovingexcavation-activity
excavator
20m
other
rock-haulingmaterial-transport
front-loader