No caption
IMG_2783.JPG
Details
Friday, January 30, 2026 · 2:00 PM
39.39481, -120.02079· 1662m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2299sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.6085
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:30
GPSDestBearing87.7963
GPSDestBearingRefTrue North
GPSHPositioningError11.9614
GPSImgDirection87.7963
GPSImgDirectionRefT
GPSSpeed0.5100
GPSSpeedRefK
GPSTimeStamp22:0:38
HostComputeriPhone 16 Pro
latitude39.3948
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0208
MeteringModePattern
ModifyDate2026-01-30T14:00:39.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.1667
Software26.2.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized426
SubSecTimeOriginal426
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows SWPPP erosion control measures in place, including a straw wattle across a dirt pathway. A portable toilet is positioned near the path, alongside a parked vehicle. The area appears to be part of a construction site setup with modest vegetation in the background.
swppp-erosion-control
dirt pathway with light vegetation clear and sunny conditions relatively clear access with minimal congestion
Safety features are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
swppp erosion control
erosion-controlvehicle-operation
bulldozer
3m
trenching
trenchingearth-moving
excavator
3m
swppp erosion control
swppp-erosion-controlsite-access-setup
dump truck
4m
trenching
trenchingexcavation
excavator
4m
trenching
trenchingexcavation-work
tarp
5m
excavation
foundation-excavationbuilding-siding
possible hand tools nearby
5m
trenching
trenchingdigging
shovel
5m
pipeline installation
waterline-alignmentsewer-cleanout-access
waterlines
6m
trenching
trenchingexcavation
excavator
6m
pipeline installation
pipeline-installationpipe-fitting
hand-tools